Signature Mansions

Discover 18 luxury villas in Dubai's prestigious Jumeirah Golf Estates, featuring world-class Earth and Fire golf courses designed in collaboration with golf champion Greg Norman. Enjoy acres of lush green space, comprehensive infrastructure, and excellent transportation accessibility.

  • AED
  • USD
  • Rub
  • Minimum cost

    36700000 AED
  • Price per sq.ft

    2280 AED
  • Project completion

    Q2 2025
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions
Signature Mansions

Signature Mansions by Signature Developers is an exclusive offering due to its prime location in Jumeirah Golf Estates, one of the world's top 10 lifestyle communities. Choose from five or six-bedroom villas available in three distinct styles: Magnolia, Jasmine, or Orchid. Purchasing a premium property in this sought-after area presents excellent investment opportunities as demand significantly outpaces offer. Additionally, a 10-year UAE "Golden Visa" can be obtained through the purchase of such high-value real estate.

Signature Mansions

Send me brochure

Signature Mansions Floor Plans

6 bedroom "Magnolia" Villa

from 36,700,000 AED
6 bedroom "Magnolia" Villa
  • Bathrooms

    7
  • Total area

    16093 sqft
Request brochure

Amenities

  • Pantry
  • Parking on lower level
  • Main and service elevators
  • Courtyard
  • Home theater
  • Rooftop swimming pool and terrace
  • 3 staff quarters
  • Clubhouse in the center of the community
  • Gated community
Jumeirah Golf Estates — one of the world's top 10 lifestyle communities

Jumeirah Golf Estates — one of the world's top 10 lifestyle communities

It's impossible not to mention first and foremost the location of the Signature Mansions. Jumeirah Golf Estates is an exclusive community that is one of the top 10 lifestyle communities in the world. Residents will enjoy living surrounded by 1,100 hectares of green space, world famous Earth and Fire golf courses and an extensive infrastructure perfectly suited for carefree living for all family members. And all this is a 10-minute drive from Dubai Marina, 15 minutes from Palm Jumeirah and a few minutes from a metro station. The area is fully gated, safe and free of cars. It is convenient to play sports, walk with the children and enjoy a measured lifestyle surrounded by nature.

A club house in the territory of the community

A club house in the territory of the community

The Clubhouse is located at the heart of the community and has everything you need to relax, have fun and train: a gym, 3 swimming pools overlooking the Earth golf course, several cafes, restaurants, bars and lounges. Residents will be pleasantly surprised by the choice of dishes, from steaks and burgers to Italian snacks and a variety of options for those who stick to a healthy diet. Here's a short list of eateries and bars: Al Botanica, Bussola, Tap & Grill, Crafty Fox Gastropub & Sports Bar, Kasturi Rooftop Lounge.

Lounge Spa

Lounge Spa

Residents of Signature Mansions will appreciate the magnificent spa complex within the Clubhouse. You will have 3 swimming pools, a sauna, equipped gym with professional trainers who offer various sport programs from power to yoga and Pilates. You can also play tennis or squash.

Layouts as the embodiment of the dream of your perfect home

Layouts as the embodiment of the dream of your perfect home

The villas are built in a modern style, using the best materials and finishes of the highest quality. The views of the golf course, the Dubai skyline and the green landscape are unobstructed. You can choose from Magnolia and Orchid villas with 6 bedrooms or Jasmine villas with 5 bedrooms. Each house has both private spaces and spacious areas where the whole family can gather comfortably. Plenty of light, underground parking for 5-7 cars, a lot of home entertainment: own cinema hall, virtual reality room, rooftop pool and viewing terrace.

Villa "Magnolia"

Villa "Magnolia"

Own one of 8 inimitable 4-level Magnolia villas of 1,433.81 sqm. At the entrance you will find a spacious double height entry foyer, a patio and a lounge area. Only quality materials, highest class finishings and exclusive interiors. Villas of this type have 6 bedrooms, a common space for relaxing and entertaining of the whole family, large balconies, panoramic windows overlooking the golf course. On the top floor, there is a swimming pool and terrace. The house has an elevator, several rooms for staff, parking at the lower level for 7 cars.

Villa "Jasmine"

Villa "Jasmine"

The collection of villas "Jasmine" in a modern style includes 5 lots with an area of 825.87 sq.m. with 4 levels and 5 bedrooms. These homes have picturesque views of the golf course and the Clubhouse. It is an excellent choice for families with children as everything has been thought out here for comfortable work, rest, meeting guests and children's games. Panoramic windows, walk-in closets in bedrooms, spacious patio space, lower level parking for 7 cars.

Villa “Orchid”

Villa “Orchid”

Buy one of 5 four-level villas of 1,102.45 or 1,148.17 sq.m. with 6 bedrooms. The Orchid Collection villas offer views of the city and marina. At the entrance, you will find a spacious double height entry foyer that seamlessly transitions to the patio. You will be amazed at the scale and abundance of light in the room. The house has parking on the lower level, large balconies, a private terrace with a rooftop pool, main and service elevators, ample pantry and three staff rooms for the driver, maid, and nanny.

Signature Mansions, Dubai — Location

The Signature Mansions are located in the heart of the new Dubai, Jumeirah Golf Estates, with easy access to the city's main highway. Palm Jumeirah and Dubai Marina are a 10 to 15 minute drive. A metro station has been built in close proximity.

10 min Dubai Marina and Marina Mall

15 min Palm Jumeirah and Nakheel Mall

25 min Downtown Dubai and The Dubai Mall

35 min Dubai International Airport and Al Maktoum International Airport

Signature Mansions Payment Plan

5 %
01
On booking
35 %
02
During construction
60 %
03
On handover